|
|
|
Engineer / Architect: | N/A |
---|---|
Location: |
Between Piers 4 and 5 Baltimore, MD |
Year Built: | N/A |
Structural Form: | Cable-stayed Girder Bridge |
Historical Details: | N/A |
Technical Details: | The majority of the forces in this bridge seem to be carried by the steel girder underneath the deck. The cable-stayed portion seems to only stiffen the deck and provides no clear load path to either pier. |
Image Source(s): | Matt Sisinni |
References: | N/A |