|
|
|
Engineer / Architect: | N/A |
---|---|
Location: |
I-695 over the Batlimore Harbor Baltimore, MD |
Year Built: | 1977 |
Structural Form: | long span steel truss bridge |
Historical Details: | The completion of the Key Bridge marked the end of construction for the Baltimore Beltway (I-695). |
Technical Details: | The structure combines the behaviors of an arch, truss and cantilever. With no expansion joints, this bridge is the second longest continuous steel truss bridge in the United States. |
Image Source(s): | Rachel Sangree |
References: | N/A |